3D Prototype Fire Escape Staircase – Case Study

The Problem

Our client was in the midst of expanding their business which required a comprehensive construction project. To ensure compliance with health and safety regulations, a new fire escape was required.

The challenges

Prior to consulting EDS, our client had acquired architectural structural calculations for the proposed fire escape. However, the drawings were unsuitable for manufacture which required a three-week lead time. Conscious of the limited time frame, EDS used the information available to produce a 3D prototype of the fire escape which would demonstrate the practicality to the client.

The Solution

Following approval of the 3D prototype, our experienced design team produced and provided the client’s third-party manufacturer with a complete drawing pack which allowed the fire escape to be fabricated to the required standards.

Contact

Unit 13

South Leicester Industrial Estate

Ellistown

Coalville

Leics LE67 1EU

Tel: 0116 287 6758

Email: enquiries@eds-groby.co.uk

About

Specialists in the design and manufacture of lifting equipment fixtures and tooling based in Leicestershire